Construction of the O&M base at Eyemouth Harbour is making great progress. This fantastic drone footage from Peter Devlin gives an aerial view of the work being carried out by Muir Construction.
The three storey, 1,040 square metre main building and its two storey, 538 square metre storage warehouse, will bring an economic boost to Eyemouth providing up to 50 permanent jobs with the harbour housing our O&M base for the project’s 25-year lifespan.
Watch the incredible footage below.